Author |
Message |
   
Catfeesh (Catfeesh)
New member Username: Catfeesh
Post Number: 6 Registered: 12-2011
| Posted on Sunday, January 01, 2012 - 07:20 pm: |
|
I've watched them all. Thanks Joe! |
   
Joe (Joe)
Moderator Username: Joe
Post Number: 665 Registered: 07-2006
| Posted on Sunday, January 01, 2012 - 01:57 pm: |
|
We overlap them about 3 inches, maybe more but not less and no, we don't use silicon, but it won't hurt. Did you watch the video we have showing this ridge being installed? http://www.slateroofcentral.com/videos.html#ridge |
   
Old_school (Old_school)
Senior Member Username: Old_school
Post Number: 753 Registered: 01-2009
| Posted on Saturday, December 31, 2011 - 07:35 pm: |
|
What does "Jenkins" recommend? = WDJR I have seen bracelets similar to that. |
   
Catfeesh (Catfeesh)
New member Username: Catfeesh
Post Number: 5 Registered: 12-2011
| Posted on Saturday, December 31, 2011 - 06:44 pm: |
|
When installing several lengths of ridge metal (eg. Jenkins 20 oz, copper ridge roll), what is the ideal overlap measurement between two pieces? Is silicone recommended? -Thanks- |